JJO Metro Fjord

Blandford

Demolition and Removal: We removed the walls, separating the garage, utility room, and kitchen to open up the area.

Framing and Insulation: We installed stud work framing and insulated the space to ensure it's energy-efficient and comfortable.

Insulated and levelling the flooring: Levelled off and insulated the floors with celotex to prevent dampness occurring and have an even surface throughout the new kitchen.

Complete Plaster and decorating: We then re-plastered the whole Kitchen area and painted the whole kitchen area white to lighten up the kitchen and bring a new life to the renovated area. 

Installed the Metro Kitchen Kit: This Kitchen included a laundry unit, oven, dishwasher unit and sink. Doors were vinyl wrapped, Quartz worktops and the flooring was Parquet. 

Overview

Location Blandford
Suppliers JJO
Cost £58,000
Duration 2 Weeks