Demolition and Removal: We removed the walls, separating the garage, utility room, and kitchen to open up the area.
Framing and Insulation: We installed stud work framing and insulated the space to ensure it's energy-efficient and comfortable.
Insulated and levelling the flooring: Levelled off and insulated the floors with celotex to prevent dampness occurring and have an even surface throughout the new kitchen.
Complete Plaster and decorating: We then re-plastered the whole Kitchen area and painted the whole kitchen area white to lighten up the kitchen and bring a new life to the renovated area.
Installed the Metro Kitchen Kit: This Kitchen included a laundry unit, oven, dishwasher unit and sink. Doors were vinyl wrapped, Quartz worktops and the flooring was Parquet.
Overview
Location | Blandford |
Suppliers | JJO |
Cost | £58,000 |
Duration | 2 Weeks |